top of page

Phase 2 Drilling Increases Scale at Morrissey Hill



Highlights

  • Phase 2 Drilling has significantly elevated the scale of lithium potential at Morrissey Hill with drilling confirming the presence of multiple, thick, stacked pegmatites¹ within a previously unrecognised package of the Leake Springs Metamorphics, at Morrissey Hill South.

  • The Leake Springs Metamorphics sequence are the same rock units which host Delta Lithium’s (ASX: DLI), Malinda and Jamieson Lithium Projects, located immediately east and west respectively of Morrissey Hill.

  • Locating this sequence at Morrissey Hill South, is significant for the project as the Leak Spring Metamorphics had previously been interpreted to exist only within the northern third of the Morrissey Hill project area.

  • A total of 57 holes for 5,282m of RC drilling has been completed to date during Phase 2 drilling.

  • The majority of all holes drilled across Phase 2, have reported multiple thick, stacked pegmatites¹ within favourable metasedimentary and lesser mafic volcanic rock types.

  • Phase 2 drilling to date has been restricted to areas where heritage surveys have been previously completed, and with a focus on testing depth continuity of outcropping pegmatites at the Morrissey Hill and Peggy Sue targets, including limited infill and extensional drilling at the Bonzer prospect.

  • Importantly, the Company has identified a pipeline of some 33 priority targets which will be methodically evaluated in 2024 once all regulatory approvals have been received, including additional aboriginal heritage surveys.

  • Results from this part of the Phase 2 Drilling campaign are expected to be received in early 2024, with all samples already sent to the laboratory for analysis.

Reach Resources Limited (ASX: RR1 & RR1O) (“Reach” or “the Company”) is pleased to advise that over 5,000m of the Phase 2 drill program has now been completed and again, multiple stacked pegmatites¹ over substantial widths have been intersected across a number of targets within the Company’s 100% owned Morrissey Hill Lithium Project, Yinnetharra WA.


Jeremy Bower CEO commented: “We are excited that our Phase 2 campaign which has been designed to test new targets to the south of Bonzer has confirmed the presence of multiple, thick, stacked pegmatites within a previously unrecognised package of the Leake Springs Metamorphics.


These are the same rock types that host Delta’s Malinda Lithium Project to our east and the Jamieson Lithium Prospect to our west. Detailed geological mapping by our geological team identified the area as a potential Malinda “look alike” with a large number of wide, strike extensive pegmatites occurring within a mixed package of older country rocks, including metasediments and mafic volcanics which we interpret as a previously unrecognised corridor of the Leake Springs Metamorphics."





¹Cautionary Note: The identification of pegmatites in the drilling completed to date does not imply the presence of lithium mineralisation. The presence of any lithium mineralisation will be determined by laboratory analyses.

Comentários


bottom of page